Tell the provider the machine model, delivery date, floor, and whether plumbing and a suitable socket are already available. Ask if the quote covers hoses, connection, levelling, test cycle, and removal of packaging or the old machine. Confirm whether a site condition could require extra parts or another visit.
Follow the manufacturer’s setup instructions and keep the installation record for warranty purposes. Browse service providers on KobStore and confirm the model, location, and included setup tasks before scheduling.





